I. Novita Sari, I. Kustiani, and A. M. Siregar, “Analysis of the Implementation of Time and Cost Control in the Construction of Building C Fkip Phase III, University of Lampung Using the Earned Value Method: Earned Value Analysis, Building C FKIP, Project Control, Time, Cost”, RJIFTU, vol. 28, no. 3, pp. 6–12, Jun. 2025.