Novita Sari, I., Kustiani, I. and Siregar, A. M. (2025) “Analysis of the Implementation of Time and Cost Control in the Construction of Building C Fkip Phase III, University of Lampung Using the Earned Value Method: Earned Value Analysis, Building C FKIP, Project Control, Time, Cost”, REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, 28(3), pp. 6–12. Available at: http://ft-sipil.unila.ac.id/ejournals/index.php/rjits/article/view/109 (Accessed: 28June2025).