(1)
Novita Sari, I.; Kustiani, I.; Siregar, A. M. Analysis of the Implementation of Time and Cost Control in the Construction of Building C Fkip Phase III, University of Lampung Using the Earned Value Method: Earned Value Analysis, Building C FKIP, Project Control, Time, Cost. RJIFTU 2025, 28, 6-12.