[1]
Novita Sari, I., Kustiani, I. and Siregar, A.M. 2025. Analysis of the Implementation of Time and Cost Control in the Construction of Building C Fkip Phase III, University of Lampung Using the Earned Value Method: Earned Value Analysis, Building C FKIP, Project Control, Time, Cost. REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung. 28, 3 (Jun. 2025), 6–12.