Analysis of the Implementation of Time and Cost Control in the Construction of Building C Fkip Phase III, University of Lampung Using the Earned Value Method
Earned Value Analysis, Building C FKIP, Project Control, Time, Cost
Main Article Content
Abstract
Infrastructure is the main support in improving education in Indonesia. University of Lampung carries out routine the constraction and renovation of buildings to support educational facility needs. In order of construction project activities on schedule and on budget, so project control is needed as in construction for building C FKIP Phase 3 University of Lampung of the was carried out using the earned value method. This research aims to analyze cost and time performance by implementing earned value analysis, as well as knowing the variance in the Phase 3 FKIP Building C building project University of Lampung. The data used in this research is secondary data in the form of time scheduling, RAB, plan drawings, and weekly project progress reports. The results of the research show that the planned time for the construction contract for Building C FKIP Phase 3 University of Lampung, is 120 calendar days and this time is by the Estimate at Schedule calculation results in the last week. The estimated total time for project completion is 120 calendar days, which means the project was completed on time and did not experience additional time during construction or it could also be called on schedule. The actual costs incurred by the contractor were 9.56307021468% lower than the planned and the value of the work completed by the contractor.
Downloads
Article Details
References
Ariane, F., dan Dinariana, D. (2018). Earned Value Analysis Pada Pengendalian Waktu Proyek Venue Layar di DKI Jakarta. Jurnal IKRA-ITH Teknologi. 2(3): 51-55.
Jaya, Komang Wira. (2021). Laporan Akhir Pekerjaan Pengawasan Lanjutan Rehabilitasi Gedung C FKIP Universitas Lampung. Bandar Lampung: CV Widya Wahana.